- Last Update:
- Kategori:
D3, Fresh Graduate, Full Time, S1, SWASTA, TeknikD3, Fresh Graduate, Full Time, S1, SWASTA, Teknik - Lokasi:
Nusa Tenggara Timur - Tipe Pekerjaan:
Full Time - Pendidikan:
D3, S1 - Pengalaman:
0 - 3 Tahun
PT Medco Power Indonesia adalah produsen listrik independen di bawah grup MedcoEnergi. Medco Power memiliki dan mengoperasikan kapasitas kotor lebih dari 3.100 MW di bisnis IPP dan O&M, yang tersebar di 20 lokasi di Indonesia.
PT Medco Energi Internasional Tbk, kadang dikenal sebagai MedcoEnergi (IDX: MEDC), adalah perusahaan publik di Indonesia yang bergerak dalam bidang energi terintegrasi. Perusahaan ini bermula dari sebuah perusahaan kontraktor pertikelir di bidang jasa pengeboran minyak dan gas bumi di daratan (onshore drilling), Meta Epsi Pribumi Drilling Co, yang didirikan Arifin Panigoro pada tanggal 9 Juni 1980. Bidang Usaha MedcoEnergi termasuk dalam bidang industri hulu yaitu eksplorasi dan produksi minyak dan gas bumi dan pertambangan tembaga dan emas serta industri hilir yaitu pembangkit listrik.
Lowongan Kerja PT Medco Power Indonesia
1. Operation Manager
Requirements :
- 3 years experience related position in Coal Fired Power Plant (PLTU) is preferred.
- Willingness to relocate in NTT (Kupang)
2. Operation Shift Coordinator / Shift Leader
Job Description :
- Organize Operators in recording and observing engine operation parameters
- Set up the Operators assignment at the time of the shift
- Periodic observation of supporting equipment in the field and delegating to Operators
- Compile and summarize logbook of all parameters to Operation Engineer
- Coordination and cooperation with PLN WRKR or PLN Dispatcher and gas supplier
- Responsible to achieve production targets
- Responsible for Security, Safety, Health and Environment of work area
Qualification :
- Bachelor degree in Electrical / Mechanical Engineering
- Have a knowledge of Coal Fired Power Plant
- Experienced in operation of Coal Fired Power Plant
- Have management and leadership skills
- Fluently both speaking and written in English
- Able to operate Microsoft Office and any related Power Plant Software
- Minimum 3 (three) years experiences as Unit Controller CCR of Coal Fired Power Plant
- Willingness to relocate in NTT (Kupang)
3. Field Operator
Job Description :
- In charge of the assigned plant during normal and incident operation.
- Operate the plant with the agreement of the Unit Controller.
- Provides a field supervision service to outside the control rooms during normal and incident operation.
- In the event of a Unit Trip or on the instruction of a Shift leader /UC/AUC, immediately reports to the Control Room. They assists the Shift leader/UC/AUC during any incident by monitoring plant conditions.
- To assist the UC/AUC during planned start-ups. This role depends on the number and urgency of technical problems existing at the time.
- Operate the equipment from local control room with guidance from Unit Controller from Central Control Room.
- Provide daily report to the Unit Controller and ensure there is no problems or anomalies in the main plant
- Check and control the field situation by doing inspection and field visit, to ensure system and process in the condition as reported
Requirements :
- Minimum Diploma Degree (D3)
- Minimum 1 years experience in fixed plant , heavy equipment or utilities operator or fresh graduate Preferable knowledge in fire protection and fire fighting
- Preferable knowledge in electrical (high voltage)
- Knowledge in basic mechanical (bearing system, hydraulic system, rotating equipment etc)
- Capable to think and solve problems logically
- Proficient in English Language
- Willingness to relocate in NTT (Kupang)
Work location : PLTU Timor – 1, Kupang NTT
Send your application to:
Recruitment.MedcopowerServis@medcoenergi.com
INFO LOWONGAN LAINNYA, DAPAT DITEMUKAN DI: T.ME/DISNAKERJA
- INFO: Akses lebih mudah di aplikasi Disnakerja Download Sekarang Disini!